Artekis checks any historized measurement against its own normal and reviews any alarm journal. Here is what it would watch on each. None of these plant types has a finding to show.
Each hot runner and barrel zone against its own normal for the mold that is running, before short shots start. Cycle time creep traced to the setpoint change behind it. The same checks run on metal temperature at the die-casting plant today.
Which machine really stopped the line: the first alarm and the first reading outside normal in the minutes before a line stop, ranked. Filler, pasteurizer tunnel and clean-in-place temperatures drifting.
Each furnace zone against its own normal for the recipe that is running, between your required accuracy tests. A recipe edit nobody mentioned at handover, traced to what followed.
Cooling capacity lost slowly over weeks, and alarm floods measured against the ISA-18.2 and EEMUA 191 benchmarks. Artekis is not a safety system and does not replace one; it shows slow loss of margin over weeks.
On the die-casting plant, cooling tower CT-1’s supply pressure dipped between 2 and 4 AM on five nights, with short cooling-water stops across Cell 2 on the same nights. A utility problem, charged to every machine it feeds.
Run on a copy of a customer’s gateway, Gateway Health found two tag scripts throwing errors: one called a logger that does not exist, the other read a value off an empty result. The finding named each tag and the line, line 8 and line 2. Small, real bugs, found without anyone digging through the logs.
A member of our team reads every message and replies, usually the same day.
Contact us →